Installation Guides: Install and activate Project 2024

Install and activate Project 2024

Microsoft Project 2024 Professional

This guide takes you through the installation and activation of Microsoft Project 2024 (Standard or Professional) on Windows. You received your 25-character product key by email after your purchase, so keep that email to hand.

Note: Project 2024 is a perpetual licence for one PC, not a subscription. A Microsoft 365 subscription is not required for installation or activation.


System requirements

Project 2024 runs exclusively on Windows. Before downloading, check these points:

  • Operating system: Windows 10 or Windows 11 (64-bit)
  • Processor: 1.6 GHz or faster, at least 2 cores
  • Memory: at least 4 GB RAM
  • Hard drive: at least 4 GB of free disk space
  • Internet connection: required for download and activation

Important: Project 2024 is not available for macOS. The licence can only be redeemed on a Windows PC.


Before installing: check your existing Office

Project 2024 is installed in addition to an existing Office and does not replace it. Word, Excel and Outlook remain unchanged. You should still bear two points in mind:

  • Alongside Office 2021, Office 2024 and Microsoft 365, Project 2024 generally runs without problems on the same PC.
  • With older Office versions (2016/2019), the setup may report a version conflict. In that case, cancel and contact us via live chat. We will check the combination together with you.
  • Uninstall any existing Project trial version or older Project version beforehand under Settings > Apps > Installed apps.

Step 1: Download Project 2024

  1. Open our download page.
  2. Select Microsoft Project 2024 in the edition you purchased (Standard or Professional).
  3. Save the installation file, for example in your Downloads folder.

Security note: Only use the installer from our download page or the official route via microsoft.com. This ensures that the file is original and unmodified.

Step 2: Run the installation

  1. Close all open Office programs (Word, Excel, Outlook).
  2. Double-click the downloaded file to start it.
  3. Confirm the User Account Control prompt with Yes.
  4. The setup downloads and installs Project automatically. No further input is required. Depending on your internet connection, this takes 5 to 15 minutes.
  5. Wait until the message "You're all set! Project is installed now." appears, then close the window.

Step 3: Activate with your product key

  1. Start Project from the Start menu.
  2. If no activation prompt appears the first time you start it, click File > Account > Change Product Key.
  3. Enter the 25-character product key from your email.
  4. Click Next. Activation takes place online and takes only a few seconds.
  5. Check under File > Account that it says "Product Activated".

Phone activation: For some keys (particularly volume licences), Microsoft suggests activation by phone. This is an automated system. You do not speak to a member of staff; you simply enter the displayed installation ID using the phone keypad. You will find step-by-step instructions in our activation help.


Common problems

  • Key is not accepted: Check for typing errors. Common mix-ups are 'O' and '0' or 'B' and '8'. It is best to copy the key directly from the email.
  • "The product key is not valid for this version": The edition and installation must match. A Standard key will not activate a Professional installation. In that case, download the matching installation file again from our download page.
  • Setup aborts: Uninstall trial and previous versions of Project, restart the PC and run the setup again.
  • Online activation fails: Check your internet connection and try again after a few minutes. Alternatively, phone activation via Microsoft's automated system also works.

Help & support

If activation still does not work after following these steps, our activation help offers solutions for the common error messages. Or contact us directly via live chat. After your purchase, you receive 90 days of free support. Please have your order number ready.

A word on our own behalf

Why are thousands of Swiss businesses still paying full price for software licenses?

At Keywi24 we specialise in verified software licenses: legal, function-tested and considerably cheaper than buying directly from the manufacturer. Our licenses come from company liquidations and surplus stock and, under the EU exhaustion principle (ECJ C-128/11), are freely tradable without restriction.

What this means for you: the same software, the same updates, the same support from Microsoft — simply at a fair price. And with our 90-day support you are never on your own should anything go wrong during setup.

Microsoft Project 2024 Professional

Matches this guide

Microsoft Project 2024 Professional

£ 79.00
View offer

Frequently asked questions

1

How do I activate Project 2024 with my product key?

Launch Project after installation and enter the 25-character key from your order e-mail. If no prompt appears, go to File > Account > Change Product Key in Project. Activation takes place online within a few seconds.

2

On how many devices can I use Project 2024?

Project 2024 is a perpetual licence for one Windows PC. When switching devices, uninstall Project from the old computer and activate it with the same key on the new PC.

3

Can I activate Project 2024 again after reinstalling Windows?

Yes. Your product key remains valid. Download the installer again from our download page and activate it with the same key. If online activation fails, use telephone activation via Microsoft's automated system.

4

How do Project 2024 Standard and Professional differ?

Standard covers project planning, Gantt charts and reports. Professional additionally offers resource management, Team Planner and connection to Project Server or Project Online. The key must match the installed edition.